Long day.
I figure the next few weeks are going to have some long days.
I was bound and determined to get that sign up. Loaded up everything and then some, including the generator. I took more than I needed in tools - once I get up there, get the trailer situated next to where the sign is going up and get started, I am not going to want to have to put everything away and go back to the shed for one thing. I was so focused on tools and things that I forgot the most important thing: The Sign!!!
Lmao. I didn't get far, lol. Imagine a 4X4 sign, attempting to put that thing up by yourself. Include in that equation a very windy day. I almost gave up, the wind was really blowing pretty good and it was making an already difficult job that much harder. But I didn't give up. I got the thing mounted and screwed in and realized I needed 4 more brackets. It was actually good it was blowing so hard today, it showed that the 4 brackets I had installed? Aren't enough. The wind pressure will eventually crack the sign and there will be over $300 down the drain. Those aluminum signs are not cheap and it is supposed to be "permanent".
So, meet Taylor for lunch and then over to Lowe's. Got all of that stuff, back to the sign, installed the brackets plus more screws that I didn't have for the earlier-installed brackets and got it all tightened up. But, the wind was still blowing and I was concerned about it bowing in the middle. I was looking at the sign next to mine. They had pretty much the exact same setup, except, they had put in 2X2's along the sign edges to help stabilize it. Yup, I'll be going to Lowe's yet once again tomorrow to get the wood for that.
I bought paint today as well to paint the boards and I was going to paint them, but that wind? I could just imagine paint blowing into my face, so I put that off. Maybe tomorrow will be better? I hope so.
Still, the sign is up and I think it looks good. I want to get the same type of solar lighting that the people with the other sign have. This is all about people being able to find the place. Enough had stated that I need a larger sign - but I had already determined that long ago, I just had that small thing in there as a temporary stop gap - at least people could see something to indicate that yes, this is the correct road to turn onto.
That project is almost done. At most a couple more hours and I won't have to think about that anymore.
The next project, of course, is the shed and washer/dryer setup. The underground wire showed up today. So, while I am at Lowe's tomorrow, I'll also be getting as much of the electrical stuff as I know what to get. Mostly, I want that outside breaker box installed before I do the trenching. I just want to be able to dig the trench, lay the pipe and the wire and get that all hooked up quickly. I don't want eternal open trenches and as it stands? I'll have to get caution tape. I'm not taking any chances with people not paying attention to where they are going, that trench will be going right by the doggy park.
I think I'm going to have to put in more boards on the inside wall to attach the breaker box to - it really just depends on how big the box is. As you may be able to tell, there are going to be numerous trips to Lowe's - I just am not in the mood to buy stuff, find out it's wrong, take it bac, etc ad-infinitum. It's probably 7 miles each way from the park to Lowe's. I'd go to Home Depot, far prefer them, but they are more than 30 miles each way.
This is somewhat new territory. I have never installed underground electrical cable nor have I installed much sewer pipe. Rest assured, I'll figure it out and get it done. I don't know how long it will take - but probably longer than what I expect. If I say a week, it's probably going to be more like 2 weeks. The machines are being shipped in the next few days, it will be a good week before they arrive. My electrical setup will include wiring for 2 of each machine. Yes, I'm only getting one of each.
New Amex card showed up today. I'm going to use it tomorrow for purchase of the stuff at Lowe's - and then turn around and pay it off after 15 days. No balances will be carried over to the next month on this card. I'll show Dunn & Bradstreet this business isn't near as likely of going under as they estimate it is! I wish I could change the mortgage to my business as well.
Fish tank, onto other trivial tidbits of - information lmao. I've been trying for a while to get it clear in that thing. It was clear for a long, long time and then suddenly on day, it got all cloudy and has been that way for months. I've tried everything. Well, everything excepting to change the water several times while cleaning out the gravel. I'm on the second half tank drain and refill in the last 7 days. I will do it again in a few days and hope this will begin to clear it up. I thought at first it was algae. I also tried some treatment the clears cloudy water. Nope. This must be it, just dirty water.
That's it, for today anyway. Busy day and will endeavor to fill tomorrow up as well.